BEGIN:VCALENDAR
VERSION:2.0
PRODID:Linklings LLC
BEGIN:VTIMEZONE
TZID:America/Los_Angeles
X-LIC-LOCATION:America/Los_Angeles
BEGIN:DAYLIGHT
TZOFFSETFROM:-0800
TZOFFSETTO:-0700
TZNAME:PDT
DTSTART:19700308T020000
RRULE:FREQ=YEARLY;BYMONTH=3;BYDAY=2SU
END:DAYLIGHT
BEGIN:STANDARD
TZOFFSETFROM:-0700
TZOFFSETTO:-0800
TZNAME:PST
DTSTART:19701101T020000
RRULE:FREQ=YEARLY;BYMONTH=11;BYDAY=1SU
END:STANDARD
END:VTIMEZONE
BEGIN:VEVENT
DTSTAMP:20220715T000417Z
LOCATION:2008\, Level 2
DTSTART;TZID=America/Los_Angeles:20220712T113000
DTEND;TZID=America/Los_Angeles:20220712T114500
UID:dac_DAC 2022_sess168_BEDES106@linklings.com
SUMMARY:IR drop fixing using Timing ECO integrated solution with IR Signof
 f tool
DESCRIPTION:Back-End Design, Engineering Tracks\n\nIR drop fixing using Ti
 ming ECO integrated solution with IR Signoff tool\n\nsukheja, Sreekantapur
 am, Kaipanatu\n\nCurrent chip design trends indicate exponential growth in
  instance counts along with usage of newer technology nodes which have str
 ingent signoff  requirements. Another important vector is the development 
 cycle time which is directly linked to time-to-market. In large & high fre
 quency designs, multi mode, multi corner timing closure with clean DVD  IR
   is always a challenge. This paper focuses on how with few key  features 
 of timing and IR signoff tool lead to efficient timing and DVD IR converge
 nce of a Multimillion instance design:\n\n1. Develop a predictable automat
 ed Signoff based flow to improve IR drop violation without degradation in 
 timing across all MCMM scenarios.\n2. Timing  ECO tool Integrates both the
  STA and IR signoff within a single platform, where IR improvement is calc
 ulated by IR-ECO tool  and timing improvement/impact is done from PTSI.\n3
 . Dynamic IR drop of a victim instance gets impacted by the switching of a
  neighboring aggressor instance\n4. Reduce the number of ECO counts by foc
 using on aggressors as well as victims.\n5. Automated flow, interactive wh
 at-if analysis for convergent closure\n\nTopic: Back-End Design
END:VEVENT
END:VCALENDAR
