BEGIN:VCALENDAR
VERSION:2.0
PRODID:Linklings LLC
BEGIN:VTIMEZONE
TZID:America/Los_Angeles
X-LIC-LOCATION:America/Los_Angeles
BEGIN:DAYLIGHT
TZOFFSETFROM:-0800
TZOFFSETTO:-0700
TZNAME:PDT
DTSTART:19700308T020000
RRULE:FREQ=YEARLY;BYMONTH=3;BYDAY=2SU
END:DAYLIGHT
BEGIN:STANDARD
TZOFFSETFROM:-0700
TZOFFSETTO:-0800
TZNAME:PST
DTSTART:19701101T020000
RRULE:FREQ=YEARLY;BYMONTH=11;BYDAY=1SU
END:STANDARD
END:VTIMEZONE
BEGIN:VEVENT
DTSTAMP:20220715T000417Z
LOCATION:2008\, Level 2
DTSTART;TZID=America/Los_Angeles:20220712T103000
DTEND;TZID=America/Los_Angeles:20220712T104500
UID:dac_DAC 2022_sess168_BEDES120@linklings.com
SUMMARY:Prototyping and verification of Power Delivery network for a Fover
 os 3DIC design.
DESCRIPTION:Back-End Design, Engineering Tracks\n\nPrototyping and verific
 ation of Power Delivery network for a Foveros 3DIC design.\n\nMazumdar, Sr
 eekumar, Kanthi, Alla, Kumar...\n\nImplementation of a robust power delive
 ry network (PDN) is an inherent challenge of Foveros based 3D IC SoCs. Wit
 h complex interdependency of the various 3DIC PDN components  (Through Sil
 icon Vias, C4 bumps, die to die microbumps, power grid pattern) across mul
 tiple dies, minor changes directly impacts power, performance and area (PP
 A) and affects design schedule. This work presents how an early prototype 
 of 3DIC PDN ensures predictable design closure while meeting PPA metrics. 
 Indigenous methods were developed using industry standard tools to bring i
 n the 3DIC PDN components from multiple stacked dies into a single framewo
 rk enabling designers to design, visualize, analyze and verify PDN prototy
 pes. Early prototyping of the 3DIC PDN is necessary to enable independent 
 design of the multiple stacked dies without any resets, ensure the Vmin ta
 rgets are honored and ensure multiple instantiated (MI) cores see similar 
 PDN. The model is scalable and can be built and verified across multiple D
 IE configurations and process nodes.\n\nTopic: Back-End Design
END:VEVENT
END:VCALENDAR
